Local ambition.
Practical engineering.
SolidCore Construction Materials Group (Tanzania) Limited
Precast solutions.
Local expertise.
SolidCore is a construction materials company based in Kibaha, Pwani Region, Tanzania. Our business covers modular precast housing, assembled concrete fencing and prestressed concrete square piles, supported by technical and production experience from China.
We welcome enquiries from developers, contractors and project teams for housing and infrastructure in Tanzania. Contact us to discuss your design brief, technical requirements and delivery programme.
Block A, Plot 654
Kibaha Town, Pwani Region
Our approximately 20,000 m² manufacturing base in Kibaha provides the local foundation for our precast concrete business in Tanzania.
Speak with our team ↗Repeatable production.
Project-specific engineering.
Precision steel moulds and repeatable production steps support dimensional and material control. The inspection plan is agreed for the project.
Factory inspection
Reinforcement, concrete materials, dimensions, curing, surface condition and release strength are covered in the quality approach.
Engineering review
Layouts, connections, anchors and foundations are designed for the applicable wind, seismic, soil and structural loads. Final performance requires calculations, review and approval.
Before your project starts.
Can the design be customised?
Layouts, doors, windows, roof appearance and finishes can be discussed, subject to structural suitability and production requirements. Customisation may affect moulds, reinforcement, logistics and cost.
What should be ready before installation?
Approved and checked foundations, safe truck access, crane working space, lifting conditions and confirmed setting-out information. Utility connection points should be coordinated before delivery.
What determines delivery time?
The approved design, module quantity, mould plan, release-strength checks, site readiness and transport route. Factory production and site preparation can proceed in parallel; a firm programme is project-specific.
How is the quotation defined?
Request a project quotation stating production, transport, lifting and installation inclusions separately from foundation works, finishing, utilities and external works. Prices and payment milestones are agreed for the final scope.
Can the system be used for multiple storeys?
The number of storeys depends on the layout, structural calculations, connections, foundation, lifting plan and approval. No fixed structural limit or blanket resilience claim is made here.
